Texas Instruments

(Electrical System)

Crosslink takes in its work on Texas Instruments. with design and build scope for the whole Clark Facility on Electrical Utility. To the installation of the first Dynamic UPS System in the country. Texas Instrument is currently running 14 units of 2.5MVA Kinolt Dynamics Uninterrupted Power Supply, the biggest on the country.

Type of work done:

Assembly Line Install

Type of work done:

Basebuild Electrical Works